Open 7am – 6pm · Emergency 24/7
★★★★★ Trusted Local Electrician · 20+ years in the construction industry
Lead In Electrical
Home / Services / Switchboard Upgrades

Switchboard Upgrades.
Done Properly The First Time.

Old ceramic fuses, no safety switches, lights flickering when the kettle boils? Time for a new board. We replace, rewire and certify switchboards across Yamba and the Clarence Valley - to current Australian Standards, with a 100% workmanship guarantee.

Certificates issued RCDs & safety switches NSW Lic #401702c
Modern switchboard upgrade with RCD safety switches installed by Lead In Electrical
Certified & Tested
Old ceramic-fuse switchboard before upgrade in a Clarence Valley home
What's Included

A Modern Board, Wired To Today's Standards.

Most homes in the Clarence Valley were built when ceramic fuses, single-pole switches and shared neutrals were standard. They aren't anymore. A switchboard upgrade is the cheapest, highest-impact electrical investment in an older home.

Full removal of old fuses and replacement with circuit breakers on every circuit.
RCDs (safety switches) on every power and lighting circuit - current Australian Standard.
Surge protection for the whole board, protecting connected appliances from spikes.
Properly labelled circuits so the next person to open the board knows what's what.
Full testing & Certificate of Compliance emailed across with your invoice.
How To Tell

Six Signs Your Board Is Due.

Any one of these is reason enough to get a proper look at it.

Ceramic Fuses Or Rewireable Wire

If your board has porcelain plug-in fuses, it pre-dates safety switches entirely. This is the #1 sign.

Tripping When You Use The Kettle

A breaker that pops every time you boil water, use the toaster or run the dryer means a circuit is overloaded or faulty.

Lights Flickering Or Dimming

If the lights dip when the air-con kicks in, the board can't supply enough current - usually a sign of old, undersized mains.

No Safety Switches (RCDs)

NSW now expects RCD protection on every circuit. A simple test push-button check will tell you - we can do this for free.

Adding Air-Con, EV Or Solar

Big new loads need a board that can carry them. Most old boards need an upgrade before the new install can be hooked up.

Selling Or Renting Out

A modern, RCD-protected board is one of the cheapest ways to make a property safer, more compliant, and easier to sell.

Not sure if your board is due?

Send through a photo of the inside - we'll tell you straight.

How A Switchboard Upgrade Runs

From First Call To Power Back On.

A typical residential switchboard upgrade is a single-day job. Larger boards or rewires take longer; we'll be straight about timing up-front.

Step 1

Quote & Photos

Send a photo of the inside of your current board, or we'll come and look. Free, no obligation, itemised quote.

Step 2

Book A Day

We organise a short power-off window with Essential Energy and confirm a day that suits you.

Step 3

Install & Test

Old board out, new board in, every circuit tested, every safety switch trip-tested before power goes back on.

Step 4

Certify & Hand Over

Certificate of Compliance issued. Labelled board, walk-through, and the workmanship guarantee in writing.

Switchboard FAQ

Common Questions

A typical domestic upgrade - new board with RCDs on every circuit, surge protection and labelling - is a one-day job. You'll be without power for around 2–4 hours of that day. Larger boards, multi-phase supplies or partial rewires can push it to two days.
It helps for the start of the day (so we can confirm circuits and labelling) and the walk-through at the end. You don't need to be there for the middle of the install. We can also arrange access through your agent if needed.
No - only during the changeover, typically 2–4 hours. We coordinate with Essential Energy for the supply disconnection so the window is as short as possible. If you work from home or need power for medical equipment, tell us up-front and we'll plan around it.
A straightforward residential upgrade to a modern RCD-protected board falls in a fairly tight price range. Bigger boards, three-phase supply, asbestos backing or partial rewires all change the number - that's why we quote properly rather than over-the-phone.
Yes - every switchboard upgrade comes with a Certificate of Compliance for Electrical Work (CCEW), emailed across with your invoice. Keep it with your house papers; it's the document buyers, agents and insurers ask for.
Yes. We follow the proper handling procedure for asbestos-containing meter panels - quote, safe removal, replacement with a compliant backing, and disposal documentation.
Other Services

While We're On Site.

A switchboard upgrade is often the right time to tidy up other electrical jobs around the house. Common combos:

Get A Free Quote

Tell Us About The Job.

Fill this in and Tim will get back to you - usually same day. The more detail the better the quote. Prefer to talk? Phone 0418 632 253 any time.

Free, itemised quotes No obligation Replies same day